[
Log In
]
10 Mollins Court
Cumbernauld, G68 9HP
Tel: +44 1236 442 500
Email:
sgc-valid8@proserv.com
Generic Flowrate Totalisation
v1.0
Cumulative & Maintenance Totals
This calculates the Mass increment from a starting total value based on Mass Flowrate and elapsed time.
The remaing increments are calulated via the same method using the starting total and elapsed time.
Configuration
Option
Setting
Number of Mass Totals
0
1
2
3
4
5
Number of Gross Volume Totals
0
1
2
3
4
5
Number of Standard Volume Totals
0
1
2
3
4
5
Number of Energy Totals
0
1
2
3
4
5
Tolerance Method
Fixed Inc. Deviation %
Fixed Time Deviation
DECC Inc. Deviation %
DECC Time Deviation
Inputs
Field Name
Units
Value
kg/s
kg/h
kg/d
t/s
t/h
t/d
lb/h
lb/s
lb/d
long ton/s
long ton/h
long ton/d
short ton/s
short ton/h
short ton/d
m³/s
m³/h
m³/d
km³/s
km³/h
km³/d
bbl/s
bbl/h
bbl/d
bbl(UK)/s
bbl(UK)/h
bbl(UK)/d
bbl(US)/s
bbl(US)/h
bbl(US)/d
Sm³/s
Sm³/h
Sm³/d
kSm³/s
kSm³/h
kSm³/d
Sbbl/s
Sbbl/h
Sbbl/d
Sbbl(UK)/s
Sbbl(UK)/h
Sbbl(UK)/d
Sbbl(US)/s
Sbbl(US)/h
Sbbl(US)/d
scf/s
scf/h
scf/d
kscf/s
kscf/h
kscf/d
MMscf/s
MMscf/h
MMscf/d
J/s
J/h
J/d
MJ/s
MJ/h
MJ/d
GJ/s
GJ/h
GJ/d
TJ/s
TJ/h
TJ/d
Intermediates
Quantity
Value
Start Time:
Stop Time:
Elapsed Time:
00:00:00.000
Results
Description
Units
Start Totals
End Totals
mg
g
kg
t
lb
long ton
short ton
mm³
cm³
m³
km³
ft³
in³
l
gal
gal(US)
bbl
bbl(UK)
bbl(US)
mSm³
cSm³
Sm³
kSm³
Sft³
Sin³
Sl
Sgal
Sgal(US)
Sbbl
Sbbl(UK)
Sbbl(US)
scf
kscf
MMscf
J
KJ
MJ
GJ
TJ
PROJECT CODE:
STREAM ID:
TEST NUMBER:
TEST CONDUCTED BY:
TEST WITNESSED BY:
ADDITIONAL WITNESS:
ADDITIONAL WITNESS:
ADDITIONAL WITNESS:
ADDITIONAL WITNESS:
COMMENTS:
TEST DATE:
03/03/2021 21:03:13